{"id":62606,"date":"2024-02-19T18:00:20","date_gmt":"2024-02-19T17:00:20","guid":{"rendered":"https:\/\/de.ambaguinee.org\/?p=62606"},"modified":"2024-02-19T18:00:20","modified_gmt":"2024-02-19T17:00:20","slug":"financement-du-pri-a-7-milliards-un-mensonge-detat-venu-de-dubai","status":"publish","type":"post","link":"https:\/\/de.ambaguinee.org\/?p=62606","title":{"rendered":"Financement du PRI \u00e0 7 milliards. Un mensonge d\u2019Etat venu de Duba\u00ef ?"},"content":{"rendered":"<div>\n<div style=\"margin-bottom:20px;\"><img width=\"960\" height=\"641\"src=\"https:\/\/i0.wp.com\/www.guinee7.com\/wp-content\/uploads\/2024\/02\/Bernard-Goumou.jpg?w=960&amp;ssl=1\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.guinee7.com\/wp-content\/uploads\/2024\/02\/Bernard-Goumou.jpg?w=960&amp;ssl=1 960w, https:\/\/i0.wp.com\/www.guinee7.com\/wp-content\/uploads\/2024\/02\/Bernard-Goumou.jpg?resize=300%2C200&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.guinee7.com\/wp-content\/uploads\/2024\/02\/Bernard-Goumou.jpg?resize=768%2C513&amp;ssl=1 768w\" sizes=\"(max-width: 960px) 100vw, 960px\"><\/div>\n<p>Au sortir de la table ronde des bailleurs (du 15 au 16 f\u00e9vrier 2024,\u00a0\u00e0 Duba\u00ef, aux Emirats Arabes Unis), en faveur du financement du Programme de R\u00e9f\u00e9rence Int\u00e9rimaire (PRI) 2022-2025\u00a0; avec tambour et trompette, le gouvernement de la Transition a r\u00e9v\u00e9l\u00e9 des annonces de contributions au financement de ce PRI de 7 milliards de dollars am\u00e9ricains. Non sans pr\u00e9ciser dans son communiqu\u00e9 que \u2018\u2018les annonces par partenaires seront publi\u00e9es ult\u00e9rieurement par le Gouvernement\u2019\u2019.<\/p>\n<p>Et c\u2019est l\u00e0 o\u00f9 le b\u00e2t blesse. Car d\u2019habitude, les annonces de financement sont d\u00e9taill\u00e9es selon les contributions de chaque partenaire. Mieux, le partenaire lui-m\u00eame fait une d\u00e9claration \u00e0 propos de sa contribution.<\/p>\n<p>\u2018\u2018M\u00eame les Arabes pr\u00e9sents \u00e0 la table ronde de Duba\u00ef qui sont friands de ce genre de financement au nom de la Jakkat, n\u2019ont pas fait de d\u00e9claration \u00e0 propos de leur participation aux 7 milliards annonc\u00e9s\u2019\u2019, nous a fait remarquer un expert. En attendant donc de savoir les noms des bailleurs et leur confirmation, on ne peut s\u2019emp\u00eacher de croire \u00e0 un gros canular servi sans mod\u00e9ration par le gouvernement de la Transition repr\u00e9sent\u00e9 par le premier ministre Bernard Goumou himself \u00e0 Duba\u00ef.<\/p>\n<p>Pour un rappel, ci-dessous le communiqu\u00e9 du gouvernement apr\u00e8s la lev\u00e9e de plus de 20 milliards de Dollars pour le financement du PNDES \u00e0 Paris en 2017.<\/p>\n<blockquote>\n<p>Paris, le 16 Novembre 2017 \u2013\u00a0Le gouvernement de la R\u00e9publique de Guin\u00e9e r\u00e9unit jusqu\u2019\u00e0 demain les partenaires \u00e9conomiques et financiers du pays dans le cadre de son Groupe consultatif organis\u00e9 \u00e0 Paris. \u00c0 cette occasion, le gouvernement guin\u00e9en a r\u00e9colt\u00e9 plus de 20 milliards de dollars d\u2019engagements, visant \u00e0 soutenir les projets phares du Plan National de D\u00e9veloppement Economique et Social (PNDES) 2016-2020, d\u00e9passant ainsi largement l\u2019objectif initial des 4,5 milliards. Le PNDES guin\u00e9en b\u00e9n\u00e9ficie de l\u2019appui inconditionnel de l\u2019ensemble de la communaut\u00e9 internationale, autour des partenaires bilat\u00e9raux et multilat\u00e9raux du d\u00e9veloppement et des investisseurs priv\u00e9s.<\/p>\n<ul>\n<li>La\u00a0<strong>Banque mondiale<\/strong>, pour son volet IDA (Association internationale de D\u00e9veloppement), s\u2019engage \u00e0 financer le PNDES \u00e0 hauteur de 1,6 milliard de dollars\u00a0;<\/li>\n<li>La\u00a0<strong>Banque islamique de d\u00e9veloppement (BID) et le groupe de coordination arabe<\/strong>, financera le PNDES \u00e0 hauteur de 1,4 milliard de dollars\u00a0;<\/li>\n<li>Le\u00a0<strong>Fonds mon\u00e9taire international<\/strong>(FMI), soutient le PNDES, dans le cadre d\u2019un accord soutenu par une facilit\u00e9 \u00e9largie de cr\u00e9dit (FEC), qui devrait \u00eatre soumis au Conseil d\u2019Administration en d\u00e9cembre 2017\u00a0;<\/li>\n<li>La\u00a0<strong>Banque africaine de d\u00e9veloppement (BAD)<\/strong>, s\u2019est engag\u00e9e \u00e0 financer le PNDES \u00e0 hauteur de 725 millions de dollars\u00a0;<\/li>\n<li>L\u2019<strong>Union europ\u00e9enne,\u00a0<\/strong>\u00e0 hauteur de 500 millions de dollars\u00a0;<\/li>\n<li>La\u00a0<strong>CEDEAO<\/strong>, \u00e0 hauteur de 223 millions de dollars\u00a0;<\/li>\n<li>La\u00a0<strong>France<\/strong>, 591 millions de dollars,\u00a0<strong>l\u2019Arabie Saoudite<\/strong>, 250 millions de dollars, le\u00a0<strong>Koweit<\/strong>100 millions de dollars, le\u00a0<strong>Japon<\/strong>\u00a075 millions de dollars, la\u00a0<strong>Belgique<\/strong>\u00a044 millions de dollars, l\u2019<strong>Italie<\/strong>, 25 millions de dollars, le\u00a0<strong>Royaume-Uni<\/strong>, 55 millions de dollars\u00a0;<\/li>\n<li>La\u00a0<strong>Chine <\/strong>a confirm\u00e9 que sa participation se ferait dans le cadre de l\u2019accord de coop\u00e9ration strat\u00e9gique et financier sign\u00e9 \u00e0 Xiamen en septembre dernier, soit un financement total de 6 milliards de dollars sur la p\u00e9riode du PNDES\u00a0;<\/li>\n<li>Les\u00a0<strong>investisseurs priv\u00e9s <\/strong>ont, quant \u00e0 eux, annonc\u00e9 plus de 7 milliards de dollars, dont une part significative de PPP (Partenariats Publics Priv\u00e9s).<\/li>\n<\/ul>\n<p>Le budget total du PNDES est de 14,6 milliards de dollars, soit entre 3 et 3,5 milliards de dollars annuels \u00e0 partir de 2017 et sur une dur\u00e9e de 4 ans. Il se construit autour des quatre piliers que sont la bonne gouvernance, la croissance inclusive, le capital humain et le d\u00e9veloppement durable.<\/p>\n<\/blockquote>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-109089\"src=\"https:\/\/i0.wp.com\/www.guinee7.com\/wp-content\/uploads\/2024\/02\/Union-europeenne.jpg?w=700&amp;ssl=1\" alt=\"\" width=\"700\" height=\"466\" srcset=\"https:\/\/i0.wp.com\/www.guinee7.com\/wp-content\/uploads\/2024\/02\/Union-europeenne.jpg?w=700&amp;ssl=1 700w, https:\/\/i0.wp.com\/www.guinee7.com\/wp-content\/uploads\/2024\/02\/Union-europeenne.jpg?resize=300%2C200&amp;ssl=1 300w\" sizes=\"(max-width: 700px) 100vw, 700px\" data-recalc-dims=\"1\"><\/p>\n<p>Le communiqu\u00e9 bien d\u00e9taill\u00e9 du gouvernement de l\u2019\u00e9poque et celui de l\u2019Union europ\u00e9enne, donnaient du cr\u00e9dit aux annonces faites \u00e0 l\u2019issue de la r\u00e9union du groupe consultatif organis\u00e9 \u00e0 Paris. on ne peut malheureusement pas en dire autant pour la rencontre qui vient de se tenir \u00e0 Duba\u00ef.<\/p>\n<p><strong>Ibrahima S. Traor\u00e9 pour guinee7.com<\/strong><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Au sortir de la table ronde des bailleurs (du 15 au 16 f\u00e9vrier 2024,\u00a0\u00e0 Duba\u00ef, aux Emirats Arabes Unis), en faveur du financement du Programme de R\u00e9f\u00e9rence Int\u00e9rimaire (PRI) 2022-2025\u00a0; avec tambour et trompette, le gouvernement de la Transition a r\u00e9v\u00e9l\u00e9 des annonces de contributions au financement de ce PRI de 7 milliards de dollars &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[22],"_links":{"self":[{"href":"https:\/\/de.ambaguinee.org\/index.php?rest_route=\/wp\/v2\/posts\/62606"}],"collection":[{"href":"https:\/\/de.ambaguinee.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/de.ambaguinee.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/de.ambaguinee.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/de.ambaguinee.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=62606"}],"version-history":[{"count":0,"href":"https:\/\/de.ambaguinee.org\/index.php?rest_route=\/wp\/v2\/posts\/62606\/revisions"}],"wp:attachment":[{"href":"https:\/\/de.ambaguinee.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=62606"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/de.ambaguinee.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=62606"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/de.ambaguinee.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=62606"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}